PR262969

Prelim Design/Analysis of Port Integration

PR262969

 

Instructions to Offerors (BSD-CS-2282)

Attachment A, A.1 & B – T&Cs

Attachment C – SOW and Reference List for PR262969    (See Attachment C Reference Documents below)

Attachment C.1 – QA and Safety Requirements 

Attachment D – Reps and Certs

Attachment D.1 – Representations Regarding Small Business Subcontracting Plan 

Attachment D.2 – QA-QC Questionnaire

Attachment D.3 – SCA Exemption

Attachment D.4 – OCI Determination

Attachment E – Pricing Sheet

Attachment F – Draft Subcontract

 

Attachment C Reference Documents:

3.1.1 80671542 Current Reference List for the Preliminary Design and Analysis of Port Integration 

3.1.2 806796e6 – Preliminary Classifications for Ports 3, 9, 11 and 14 from Annex B of their Procurement Arrangements 

3.1.3 Requirements_for_Producing_a_Quality_Pla_22MFMW_v4_o 

3.1.4 8043657d – 1.4 Quality Plan Template for Suppliers and Subcontractors

3.1.5 80412251 – 2.0 Design and Analysis Calculation Qualification Record

3.1.6 803fee84 – 6.0 Deviation Request Procedure 

3.1.7 803f59df – 2.5 Deviation Request Form

3.1.8 8043b412 – 2.4 Non-Conformance Report Form

3.1.9 803f35ae – 5.0 Design Analyses and Calculations Procedure

3.1.9.a Reviewer_checklist_for_CFD_analyses_VJJSZ3_v1_0

3.1.9.b Independent_peer_reviewer_checklist_for__VJJUDV_v1_0

3.1.9.c Reviewer_Checklist_for_Seismic_analyses_Q6FH53_v2_1

3.1.9.d Independent_Peer_Reviewer_Checklist_for__V5Z65L_v1_3

3.1.9.e Reviewer_Checklist_for_Structural_Analys_RYATXV_v2_0 

3.1.9.f Independent_Peer_Reviewer_Checklist_for__VQVFEN_v1_0 

3.1.9.g Check_list_for_Review_of_Nuclear_Analyse_VP6G35_v1_1

3.1.9.h Checklist_-_Nuclear_Analysis_Independent_T8K5CG_v3_3 

3.1.9.i Checklist_for_EM_analysis__Independent_P_VNYHRB_v2_6

3.1.9.j Checklist_for_EM_Analyses__Reviewer_PRAT8Q_v3_6  

3.1.10.a Instructions_for_Computational_Fluid_Dyn_VUEEDB_v2_0

3.1.10.b Instructions_for_Seismic_Analyses_VT29D6_v2_0 

3.1.10.c Instructions_for_Structural_Analyses_35BVV3_v4_0

3.1.10.d Instructions_for_Nuclear_Analyses_R7XRXB_v5_3 

3.1.10.e Instructions_for_EM_Analyses_TSZ9KQ_v3_3

3.1.11.a Template_for_CFD_analysis_reports_TL7H73_v1_1

3.1.11.b Template_for_Seismic_Analysis_Reports_VAET99_v1_0

3.1.11.c Template_for_Structural_Analysis_Reports_VQVTQW_v1_0

3.1.11.d Template_for_EM_Analysis_Reports_6NVTVK_v2_1 

3.1.12 8041072c – 6.4 Design Readiness Review Procedure

3.1.13 80498113 – 8.0 List of Deliverables Procedure 

3.1.14 80422492 – 3.1 Software Control and Validation Procedure 

Statement of Work for Preliminary Design and Analysis of Port Integration 80671542 – 1.0